SeHAWK® FGD 550 gpm Treatment Plant

Tuesday, February 2, 2016

An eastern power utility, and prior owner of a competing biological metals removal system, switched to the SeHAWK® FGD bioreactor for selenium, mercury, nitrate, and arsenic ELG compliance. The second of three plants for the utility, the SeHAWK® FGD installation is located at a 2000 MW eastern power plant and is designed for a flow range of 150-550 gpm. Since commissioning in 2018, the SeHAWK® has been online to deliver consistent compliance with ELG standards.